|
Dec 30, 2024
|
|
|
|
CNET 3190 - Construction Scheduling
3 hours (2;3)
Study of construction scheduling utilizing current techniques including Critical Path Method (CPM), the Precedence Method (PM), the Program Evaluation and Review Technique (PERT) and a probabilistic method.
Prerequisite(s): CNET 2180 .
Course specific fees (in addition to tuition and mandatory): Academic (AF) per hour: $52.70
Add to My Catalog (opens a new window)
|
|